{"id":118,"date":"2011-08-17T00:25:44","date_gmt":"2011-08-17T00:25:44","guid":{"rendered":"http:\/\/jackconstruction.com\/jfhblog\/?p=118"},"modified":"2016-10-05T22:19:28","modified_gmt":"2016-10-05T22:19:28","slug":"marion-country-club-pool-deck-part-3","status":"publish","type":"post","link":"http:\/\/jackconstruction.com\/jfhblog\/2011\/08\/marion-country-club-pool-deck-part-3\/","title":{"rendered":"Marion Country Club Pool Deck, Part 3"},"content":{"rendered":"<p>The concrete pad between the new deck and the pool was in pretty bad shape.\u00a0 The solution here was to fill in the area with a thick layer of gravel and then set paving stones on top of the gravel.\u00a0 The gravel allows for drainage of rainwater and provides a solid base to set the pavers into.<\/p>\n<p><a href=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00201201105091339.jpg\"><img loading=\"lazy\" decoding=\"async\" style=\"display: inline; border: 0px;\" title=\"IMG00201-20110509-1339\" src=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00201201105091339_thumb.jpg\" alt=\"IMG00201-20110509-1339\" width=\"316\" height=\"242\" border=\"0\" \/><\/a><a href=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00202201105091339.jpg\"><img loading=\"lazy\" decoding=\"async\" style=\"display: inline; border: 0px;\" title=\"IMG00202-20110509-1339\" src=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00202201105091339_thumb.jpg\" alt=\"IMG00202-20110509-1339\" width=\"315\" height=\"242\" border=\"0\" \/><\/a><\/p>\n<p>The paver stones are placed tightly together on the packed gravel.\u00a0 The result is a very nice and comfortable walkway.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00205201105111552.jpg\"><img loading=\"lazy\" decoding=\"async\" style=\"display: block; float: none; margin-left: auto; margin-right: auto; border: 0px;\" title=\"IMG00205-20110511-1552\" src=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/IMG00205201105111552_thumb.jpg\" alt=\"IMG00205-20110511-1552\" width=\"395\" height=\"302\" border=\"0\" \/><\/a><\/p>\n<p>The photo above shows the completed bench, paved path, and the framing for the cabana.\u00a0 The cabana is now ready to be roofed.\u00a0 It is about time to open the pool!<\/p>\n<p><a href=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/1424361.jpg\"><img loading=\"lazy\" decoding=\"async\" style=\"display: inline; border: 0px;\" title=\"142436\" src=\"http:\/\/jackconstruction.com\/jfhblog\/wp-content\/uploads\/2011\/08\/142436_thumb1.jpg\" alt=\"142436\" width=\"143\" height=\"108\" border=\"0\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The concrete pad between the new deck and the pool was in pretty bad shape.\u00a0 The solution here was to fill in the area with a thick layer of gravel and then set paving stones on top of the gravel.\u00a0 The gravel allows for drainage of rainwater and provides a solid base to set the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":541,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[9,3],"tags":[],"class_list":["post-118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-decks","category-lake-arcadia"],"_links":{"self":[{"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/posts\/118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/comments?post=118"}],"version-history":[{"count":3,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/posts\/118\/revisions"}],"predecessor-version":[{"id":543,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/posts\/118\/revisions\/543"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/media\/541"}],"wp:attachment":[{"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/media?parent=118"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/categories?post=118"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/jackconstruction.com\/jfhblog\/wp-json\/wp\/v2\/tags?post=118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}